Saturday, 1 August 2009

Results of Dave’s conservatory prep work are in at last

Well I’ve been waiting for a sunny day to take these photos, but there hasn’t been one all week so sod it. Here they are, not wonderful photos (blame it on poor light).
 
What I´m referring to here is just the wood bits, nothing else! 
 
Wide angle view, what a lovely finish…
 
55
 
Outside left…
 
58
 
Back…
 
62
 
Outside right…

64 
 
BUT, there’s still more to be done…
 
Water damage to the wooden rail (thanks to the flappy bits that don’t meet properly). So the whole rail will have to be sanded down and re-varnished…

67 
 
And the blue paintwork around the Windscreen needs plastic surgery…
 
69
 
I think Dave’s going to leave these two man jobs till after the steel frame goes up. Talking of which, Canvasman Chris is bringing his “top guy” to help him fit the frame. Measurements for the pattern / templates will be taken on Monday – that’s provided it’s not raining of course.
 
So get your brolly’s out folks and be prepared for a Nationwide flood alert. (Reminder, I said Monday…)

No comments:

Post a Comment